Try Semrush One for Free
The leading platform that unifies SEO authority and AI visibility.
Get Your Ticket Now
One day. Real strategies. Built for marketers who play to win.
October 13, 2026London, UK
Knowledge Base
Semrush Toolkits
SEO
Backlinks
Find Competitor’s Broken Backlinks

Find Competitor’s Broken Backlinks

A broken backlink is a link between two websites that no longer works. The reason for this could be that the link’s landing page has been moved, or removed completely.

The method of “broken link building” consists of two main steps:

  • Finding links in your niche that are broken, and 
  • Reaching out to the website owner to tell them and suggest that they replace the broken link with a link to something on your website. 

If you have relevant content on your site, it can be an easy way to build some quick links without much work. 

Here’s the best way you can use Semrush to find broken links on a competitor’s website. 

One of the best ways to find your competitors broken backlinks is with the Backlinks tool. The first thing you are going to want to do is to find out who your competitors are (if you don’t know already). To find this out, enter your domain into the search bar and then navigate to the competitors' tab of the Backlinks tool.

Backlinks tool interface with an arrow pointing to the three-dot menu that reveals the Competitors tab option.

Backlinks tool Competitors report interface.

Once you have a list of your competitors, you’re now going to want to query that competitor's domain in the report. Now you’ll want to navigate to the indexed pages report and filter by Broken Pages error. 

The Broken Pages filter allows you to look for links that have error codes associated with the link. 

Indexed Pages report in Backlinks tool. A box called Broken Pages is checked and highlighted.

Keep in mind, that a 4xx error code means there is an issue with the website, a 5xx error code means there is an issue with the server, and a 3xx code means there is a redirect involved. For the full list of HTML status codes, read this article.

The 404 error code indicates that a link is broken, so the previously live backlinks that point to a 404 page on your competitor’s site are the links you’re looking for.  

You can sort the table by the number of Backlinks or Domains. Clicking on the number of backlinks next to each URL will lead you to the Individual URL Backlinks report:

Example of sorting the Backlinks report by Broken Pages for an individual URL.

Here you will see the list of all pages referring to the broken URL on your competitor’s website. Filter the report by Active (to exclude lost links) and Export the results.

Backlinks report in Backlinks tool. This report is set to display only active backlinks with this filter being highlighted on top of the report. On the right side, the Export button is highlighted as well.

You can repeat this step for any number of broken links and any of your competitors. 

Now that you’ve gained a list of websites linking to your competitors through the Backlinks tool, you’re going to want to upload that list of prospects into a Link Building Tool campaign. 

Once you start your Link Building Tool campaign, you can upload a list of domains that have a link to a competitor's broken page.

Next, you’ll want to connect your email address to your campaign. Simply click on the add mailbox button at the top of your prospects, just under your domain name.

Link Building Prospects report. The Add Mailbox feature on top is highlighted as well as the Uploaded prospects field, prompting you to upload your own backlink prospects and connect your mailbox with the tool.

After you connect your email you can create a customized email template that can be used to reach out to site owners. For this step, you’ll need to move over to the In Progress tab. Once here click on the blue contact button. 

This will prompt you to the email widget where you can customize the content of your email that will then be sent to the site owners of the broken backlink. 

In Progress report in the Link Building tool. Among the list of potential backlinks, a red arrow is pointing towards the blue Contact button on the right.

Refer to the Link Building Email Outreach (In Progress Report) article if you are interested to learn about reaching out with your pitch for a link.

Recently viewed